The short answer
In the US, This Old House puts a 200-amp panel with installation at $1,300 to $3,000, and Fixr gives $1,800 to $4,500 for a 200-amp upgrade with labor. In Canada, HomeStars lists CA$1,500 to CA$3,000 for a basic 200-amp panel replacement and CA$3,000 to CA$5,000 for a full service upgrade. In the UK, Checkatrade puts a typical consumer unit replacement at about £485.
A panel swap and a service upgrade are different jobs. A swap replaces the box. A service upgrade also raises the power your home can draw, which can mean a new meter base, a new service cable and work by your utility.
| Job | Typical price | Source |
|---|---|---|
| US 200-amp panel, installed | $1,300 to $3,000 | This Old House |
| US 200-amp upgrade with labor | $1,800 to $4,500 | Fixr |
| Canada basic 200-amp panel replacement | CA$1,500 to CA$3,000 | HomeStars |
| Canada full service upgrade | CA$3,000 to CA$5,000 | HomeStars |
| UK consumer unit replacement | About £485 (10-way unit with RCBOs) | Checkatrade |
When you need a new panel
Ask a licensed electrician to look at your panel if any of these apply:
- You are adding a big load, such as an EV charger, a heat pump, a hot tub or an electric range, and the panel has no room or not enough capacity.
- Breakers trip often or fuses keep blowing. See signs your home needs rewiring.
- The panel is old, still uses screw-in fuses, or shows rust, scorch marks or a burning smell.
- An insurer, buyer or inspector flagged it.
- In the UK, an EICR found faults in an old fuse box with no RCD protection.
What changes the price
- Panel swap or service upgrade. A new meter base, service cable or mast adds cost, and your utility may need to disconnect and reconnect the supply.
- Amperage and number of circuits. A bigger panel with more spaces costs more, and so does moving or labeling many circuits.
- Permits and inspection. Most areas need a permit and an inspection for panel work. In Ontario, the Electrical Safety Authority inspects the work.
- Code fixes found on the day, such as grounding, bonding or damaged wiring.
- In the UK, the number of ways and the protection type. RCBOs on every circuit cost more than a split-load board, and Checkatrade notes the number of circuits is the main price driver.
UK rules: consumer units are notifiable work
In England and Wales, replacing a consumer unit is notifiable work under Part P of the Building Regulations. Use an electrician registered with a competent person scheme such as NICEIC, NAPIT or ELECSA, so the work is certified and notified to building control.
When the job is done, you should get an Electrical Installation Certificate and, later, a Building Regulations compliance certificate. See how to check an electrician's license for the registers to search.
What a fair quote includes
- The panel brand, amperage and number of spaces, and whether breakers are included.
- Whether the meter base, service cable or utility work is included or extra.
- Permit and inspection fees, and who books the inspection.
- How long the power will be off.
- Labeling of every circuit and a workmanship warranty.
Sources
Prices were checked on 20 November 2026. They are third-party estimates, not quotes from Joltexo or from the businesses we list.
